Pre-production approval checklist

The sign-off before anything is cut. Every box confirmed on the approved drawing, so production builds what was agreed — not an assumption.

ALUMAX Guides · design.alumax.pro a planning reference, not a quotation

Drawing & dimensions

  • Approved drawing reference recorded on the quotation.
  • Every opening measured on site and fixed on the drawing.
  • Clearances checked — door swings, appliance gaps, circulation.

Specification

  • Material specified per moisture zone — dry / semi-wet / wet, not one blanket board.
  • Hardware, runners and lock grade confirmed.
  • Finish, colour and edge detail confirmed.
  • Glass / infill and privacy spec confirmed where applicable.

Coordination

  • M&E positions agreed with the electrician and plumber before production.
  • Who supplies, and who terminates, each service is recorded.
  • Ceiling, lighting and cabinet coordinated where they meet.

Commercials

  • Exclusions listed — countertop, plumbing, electrical, hacking, waterproofing, scaffolding.
  • Specialist-trade allowances / provisional sums stated separately, not hidden in the product line.
  • Deposit, lead time and payment stages agreed.