Sample image · real photos coming soon示意图片 · 实拍照片即将上线- Final measurement
- Material
- Colour
- Hardware
- Appliance dimensions
- Drawing approved
- Quotation approved
- Deposit received
- Production release signed
- Production starts
Why it protects you为何它能保护你
Production only starts once scope, material, colour, hardware, dimensions, quotation, drawing and deposit are all confirmed — so what we build is exactly what you approved, with no surprises.只有在范围、材料、颜色、五金、尺寸、报价、图纸与订金全部确认之后,生产才会启动——这样我们制作出来的,正是你所审批通过的,绝无意外。
The checklist检查清单
Confirmed before production release:放行生产前须确认:
- Final measurement confirmed最终量尺已确认
- Material confirmed材料已确认
- Colour confirmed颜色已确认
- Hardware confirmed五金已确认
- Appliance dimensions confirmed电器尺寸已确认
- Drawing approved图纸已审批
- Quotation approved报价已审批
- Deposit received订金已收到
- Production release signed生产放行已签署
Changes after approval审批后的变更
Changes after approval may affect price, timeline and schedule, and are handled through a clear variation order — so scope stays clear for both sides.审批后的变更可能影响价格、工期与排期,并通过清晰的变更单来处理——以确保双方对范围始终清楚明了。
Key takeaways核心要点
- No approved drawing pack → no production.没有审批通过的图纸包 → 不生产。
- Nine items confirmed before release.放行前确认九个项目。
- Changes go through a variation order.变更须通过变更单处理。
- What you approve is what gets built.你所审批的,就是制作出来的。
Next step下一步
Apply this to your project应用到您的项目
Get a 2-minute Budget Range on alumax.pro — material, package and next step, matched to your zone.在 alumax.pro 上用 2 分钟获取预算范围——根据您的区域匹配材料、套餐和下一步。