Before-production checklist生产前检查清单

ALUMAX’s strongest operating principle: no approved drawing pack, no production release. Here’s exactly what’s confirmed before anything is built.ALUMAX 最重要的运营原则:没有已批准的图纸包,就不放行生产。以下是开工前需确认的全部事项。

3 min read分钟阅读

Before-production checklistSample image · real photos coming soon示意图片 · 实拍照片即将上线
  1. Final measurement
  2. Material
  3. Colour
  4. Hardware
  5. Appliance dimensions
  6. Drawing approved
  7. Quotation approved
  8. Deposit received
  9. Production release signed
  10. Production starts
No approved drawing pack, no production release. All nine confirmed and signed — then, and only then, we build.

Why it protects you为何它能保护你

Production only starts once scope, material, colour, hardware, dimensions, quotation, drawing and deposit are all confirmed — so what we build is exactly what you approved, with no surprises.只有在范围、材料、颜色、五金、尺寸、报价、图纸与订金全部确认之后,生产才会启动——这样我们制作出来的,正是你所审批通过的,绝无意外。

The checklist检查清单

Confirmed before production release:放行生产前须确认:

  • Final measurement confirmed最终量尺已确认
  • Material confirmed材料已确认
  • Colour confirmed颜色已确认
  • Hardware confirmed五金已确认
  • Appliance dimensions confirmed电器尺寸已确认
  • Drawing approved图纸已审批
  • Quotation approved报价已审批
  • Deposit received订金已收到
  • Production release signed生产放行已签署

Changes after approval审批后的变更

Changes after approval may affect price, timeline and schedule, and are handled through a clear variation order — so scope stays clear for both sides.审批后的变更可能影响价格、工期与排期,并通过清晰的变更单来处理——以确保双方对范围始终清楚明了。

Key takeaways核心要点

  • No approved drawing pack → no production.没有审批通过的图纸包 → 不生产。
  • Nine items confirmed before release.放行前确认九个项目。
  • Changes go through a variation order.变更须通过变更单处理。
  • What you approve is what gets built.你所审批的,就是制作出来的。