ALUMAX’s strongest operating principle: no approved drawing pack, no production release. Here’s exactly what’s confirmed before anything is built.ALUMAX 最重要的运营原则:没有已批准的图纸包,就不放行生产。以下是开工前需确认的全部事项。Prinsip operasi ALUMAX yang paling kukuh: tiada pakej lukisan yang diluluskan, tiada pelepasan pengeluaran. Inilah dengan tepat apa yang disahkan sebelum apa-apa dibina.

3 min read分钟阅读min bacaan

Technical decisionNeeds site measurement, M&E or trade coordination — confirmed by ELS on an approved drawing.

Decision in 10 seconds

Settle every open decision before production — the checklist is what prevents on-site guesswork.

Confirm
Dimensions, appliances and finishes.
Approve
The drawing, in writing.
Then
Release to production — nothing pending.
See the ALUMAX tools
  1. Final measurement
  2. Material
  3. Colour
  4. Hardware
  5. Appliance dimensions
  6. Drawing approved
  7. Quotation approved
  8. Deposit received
  9. Production release signed
  10. Production starts
No approved drawing pack, no production release. All nine confirmed and signed — then, and only then, production begins.

Why it protects you为何它能保护你Mengapa ia melindungi anda

Production only starts once scope, material, colour, hardware, dimensions, quotation, drawing and deposit are all confirmed — so what is produced is exactly what you approved, with no surprises.只有在范围、材料、颜色、五金、尺寸、报价、图纸与订金全部确认之后,生产才会启动——这样生产出来的,正是你所审批通过的,绝无意外。Pengeluaran hanya bermula setelah skop, bahan, warna, perkakasan, dimensi, sebut harga, lukisan dan deposit semuanya disahkan — jadi apa yang dihasilkan adalah tepat seperti yang anda luluskan, tanpa kejutan.

The checklist检查清单Senarai semak

Confirmed before production release:放行生产前须确认:Disahkan sebelum pelepasan pengeluaran:

  • Final measurement confirmed最终量尺已确认Pengukuran akhir disahkan
  • Material confirmed材料已确认Bahan disahkan
  • Colour confirmed颜色已确认Warna disahkan
  • Hardware confirmed五金已确认Perkakasan disahkan
  • Appliance dimensions confirmed电器尺寸已确认Dimensi perkakas disahkan
  • Drawing approved图纸已审批Lukisan diluluskan
  • Quotation approved报价已审批Sebut harga diluluskan
  • Deposit received订金已收到Deposit diterima
  • Production release signed生产放行已签署Pelepasan pengeluaran ditandatangani

Changes after approval审批后的变更Perubahan selepas kelulusan

Changes after approval may affect price, timeline and schedule, and are handled through a clear variation order — so scope stays clear for both sides.审批后的变更可能影响价格、工期与排期,并通过清晰的变更单来处理——以确保双方对范围始终清楚明了。Perubahan selepas kelulusan mungkin menjejaskan harga, garis masa dan jadual, dan diuruskan melalui perintah variasi yang jelas — supaya skop kekal jelas untuk kedua-dua pihak.

Key takeaways核心要点Intipati utama

  • No approved drawing pack → no production.没有审批通过的图纸包 → 不生产。Tiada pakej lukisan yang diluluskan → tiada pengeluaran.
  • Nine items confirmed before release.放行前确认九个项目。Sembilan perkara disahkan sebelum pelepasan.
  • Changes go through a variation order.变更须通过变更单处理。Perubahan melalui perintah variasi.
  • What you approve is what gets built.你所审批的,就是制作出来的。Apa yang anda luluskan itulah yang dibina.

Technical decision · Next step下一步Langkah seterusnya

Apply this to your project应用到您的项目Terapkan ini pada projek anda

This needs a site measurement, M&E or trade coordination — an ELS pre-check confirms it on an approved drawing before anything is priced to build.

Common questions常见问题Soalan lazim

People also ask其他人也在问Orang juga bertanya

What needs to be confirmed before ALUMAX starts building my cabinets?在 ALUMAX 开始制作我的橱柜之前,需要先确认哪些事项?Apa yang perlu disahkan sebelum ALUMAX mula membina kabinet saya?

Production is only released once nine items are confirmed: final measurement, material, colour, hardware, appliance dimensions, an approved drawing, an approved quotation, a received deposit, and a signed production release. The guiding principle is simple: no approved drawing pack means no production.只有在九项内容全部确认后才会放行生产:最终量度、板材、颜色、五金、电器尺寸、已批准的图纸、已批准的报价、已收到的订金,以及已签署的生产放行单。原则很简单:没有批准的图纸文件,就不会进入生产。Pengeluaran hanya dilepaskan setelah sembilan perkara disahkan: ukuran akhir, bahan, warna, perkakasan, dimensi peralatan, lukisan yang diluluskan, sebut harga yang diluluskan, deposit yang diterima, dan pelepasan pengeluaran yang ditandatangani. Prinsip panduannya mudah: tiada pakej lukisan yang diluluskan bermakna tiada pengeluaran.

Can I make changes to my cabinet design after I've already approved it?在我批准设计之后,还可以更改橱柜设计吗?Bolehkah saya membuat perubahan pada reka bentuk kabinet saya selepas saya telah meluluskannya?

Yes, but changes made after approval may affect the price, timeline and schedule, and they are handled through a clear variation order. This keeps the scope clear for both sides.可以,但在批准之后所做的更改可能会影响价格、交期和排程,并会通过明确的变更单(variation order)来处理。这样能让双方的工作范围保持清晰。Ya, tetapi perubahan yang dibuat selepas kelulusan boleh menjejaskan harga, garis masa dan jadual, dan ia dikendalikan melalui perintah variasi yang jelas. Ini mengekalkan skop yang jelas untuk kedua-dua pihak.

Why does ALUMAX insist on an approved drawing before production?为什么 ALUMAX 坚持要先有批准的图纸才开始生产?Mengapa ALUMAX menegaskan lukisan yang diluluskan sebelum pengeluaran?

Production only starts once scope, material, colour, hardware, dimensions, quotation, drawing and deposit are all confirmed, so what gets built is exactly what you approved with no surprises. In short, what you approve is what gets built.只有在范围、板材、颜色、五金、尺寸、报价、图纸和订金全部确认后才会开始生产,这样制作出来的就是你所批准的内容,不会出现意外。简单说,你批准什么,就做什么。Pengeluaran hanya bermula setelah skop, bahan, warna, perkakasan, dimensi, sebut harga, lukisan dan deposit semuanya disahkan, jadi apa yang dibina adalah tepat seperti yang anda luluskan tanpa kejutan. Ringkasnya, apa yang anda luluskan itulah yang dibina.